jeroezie Posted August 30 Posted August 30 I set up a train route from Zdunska Wola signal L5 to the free track beyond signal P (track 1 towards Sieradz). When I executed the route, the interlocking throwed switch 30cd from plus (what it should be and if I remember correctly was, but do not pin me to that please) to the minus position. This is very odd since the switch 30cde would be in plus position for this route. To my surprise, the interlocking thought the route was all safe/clear, and cleared the signal while the switch was set to the wrong track. Interestingly, if I set a route from signal P to G7, the switch 30cd is also set to minus position by the interlocking. Bug discovered in game build 20/08/2026 - 16:26 on the int1 server. I did notice during some experimentation, that the manual set to plus or minus position, and stop / unstop the switch in a position, seems to happen both for switch 30cd and 30ab simultaneously, like that are interlinked with each other , which does not make sense to me.
SIMRAIL Team Admin BOT Posted yesterday at 09:38 AM SIMRAIL Team Posted yesterday at 09:38 AM Thank you for reporting this issue! Internal ticket number: #4431 Dziękujemy za zgłoszenie tego problemu! Wewnętrzny numer zgłoszenia: #4431
Recommended Posts