DazT Posted April 28, 2024 Posted April 28, 2024 Whilst working Kozłów, Tunel AI requested to run a train on Track 1 towards Kozłów. The AI at Tunel released the line lock and the arrow was flashing in the right direction (towards Tunel) but it never then sent WBL. The only way to resolve was to leave and rejoin after which point the left line running had been accepted by the Kozłów (as AI) Also noted that once track 1 was in left line running, there is no way to press the "Allow left track running" button to clear signal Y Server: EN1 ~0020hrs-0030hrs (UTC+1) Build: EAB 21/04/2024 14:12
SIMRAIL Team uetam Posted April 29, 2024 SIMRAIL Team Posted April 29, 2024 I tested this today but i am not able to replicate it. Please report in this topic if this happens again.
DazT Posted April 29, 2024 Author Posted April 29, 2024 (edited) Might be a long time then until I see it again, needs Tunel to be AI for it to happen and the right set of circumstances! I hoped onto Tunel as a player as bit later, with Kozłów as AI and it (left track over Track 1) worked as designed! Edited April 29, 2024 by DazT 1
DazT Posted May 1, 2024 Author Posted May 1, 2024 (edited) Happened again player to player this time over Track 2. It's looking like if Tunel just uses "Direction change" on the workstation at Tunel it doesn't work and needs to be a full KO/WBL to change direction. Server EN1 17:00 - 17:10 01/05/2024 Edited May 1, 2024 by DazT
Magespell Posted July 1, 2024 Posted July 1, 2024 This same thing happened to me last evening EN1 30 June 2024. It was a perfect use of left track from Tunel. A slow freight on Track 2, passenger with long wait on Platform 2, track open to Sprowa and Tunel wanting to put a Pendo on Track 1. I could not get the direction change finalized and left the station and the AI handled it. This is the second time this happened to me at this station.
DazT Posted July 6, 2024 Author Posted July 6, 2024 I've have an instance where I've tried to use track 2 from Kozlow towards Tunel, asked the AI at Tunel to accept a train over track 2 (left track) and got the reply that it's got a higher priority train to run and can't accept, at 3am with sod all around. The whole left tracking needs looking at at both, more so when one of the boxes is AI controlled.
Recommended Posts