Jump to content
Następne podsumowanie tygodnia pojawi się 16.11.2024 | The next summary of the week will be published on 16.11.2024

Sneak Peek for the non-Discord users


Recommended Posts

vor 17 Minuten schrieb SugaCane:

But not all dispatcher station will get one 

As I understand the messages of uetam almost all dispatcher posts, where it is useful, will get cameras. So I guess DGW is one of them

  • Like 1
Link to comment
Share on other sites

vor 9 Stunden schrieb Moooritz:

As I understand the messages of uetam almost all dispatcher posts, where it is useful, will get cameras. So I guess DGW is one of them

Yes, in real life there are 2 cameras, because the SKP-Station (had the job to look for the tail light/signs) was closed and this task got over to the dispatcher. And for this he needs the 2 cameras. Beforehand, you are not allowed to operate the line block (Ko).

 

image.jpeg.55b9ebe534820d42db9be37f8495a92e.jpeg

  • Thanks 2
  • I agree 2
Link to comment
Share on other sites

  • 3 weeks later...
  • 4 weeks later...

ETCS system is one of the coming SimRail features. 🚅🖥️
The European Train Control System (ETCS) is the signalling and control component of the European Rail Traffic Management System (ERTMS). It is a replacement for legacy train protection systems and designed to replace the many incompatible safety systems currently used by European railways. The standard was also adopted outside Europe and is an option for worldwide application. In technical terms it is a type of positive train control (PTC).

image.thumb.jpeg.5758aea37b28e6d5fa0689ef6b06f9c1.jpeg

Edited by SugaCane
picture added
  • Like 1
  • I agree 2
Link to comment
Share on other sites

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use Privacy Policy