Jump to content

Set of two points should move in sequence


Recommended Posts

Posted

Hi!

Not sure if this can be considered a bug, an improvement or just the result of an overly pedantic rail enthusiast with his own weirdly strong interest for electromechanical railway interlockings buuut...

 

When on a type E device two points are moved from a single button, they should move in sequence: the button is pushed or pulled, the first point is thrown, then the second one starts moving. This results in a longer time for the set of two points to reach the required position, and in a double jump of the ammeter. Also, the electric control of the actual position is unique for the whole set of points, so the yellow lights indicating the position should always turn off and on at the same time.

 

That is if there aren't some versions of the E devices I might not be aware of.

I'm sorry to bother you with such a shameless example of pedantry, it's just something that has been bugging me (bugs pun intended).

Thanks for the patience, and keep up the great work!

  • SIMRAIL Team
Posted
Thank you for reporting this issue. A similar problem has already been reported by other users.
Dziękujemy za zgłoszenie tego problemu. Podobny problem był już zgłaszany przez innych użytkowników.
Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use Privacy Policy