manolollr Posted January 4 Posted January 4 If there are speed limits near, the new limit is applied before the older limit is still active. For example, at the track Sosnowiec Główny -> Sosnowiec Południowy, there is a 20 km/h speed limit, the limit ends but the entire train must pass to really end. Near there is a 40 km/h limit, it is apllied immediately but the train still haven't passed the 20 km/h limit. The same at the scenario KWK Staszatowice - Sedziskow -> (Cargo) Coal mine operations. At the track Katowice Janow -> Katowice Muchowiec KMB, at kilometer 34,9 there is a 20 km/h limit that ends at km. 35, later at kilometer 35,2 there is a 30 km/h speed limit. It is applied immediately, but I a have a 577 meters long train, so the last wagon still haven't passed the 20 km/h limit. The end of 20 km/h signal doesn't have a "C". It's a bridge, it's not a level crossing, so the last wagon must pass the bridge at 20 km/h.
SIMRAIL Team Admin BOT Posted Sunday at 08:46 AM SIMRAIL Team Posted Sunday at 08:46 AM Thank you for reporting this issue. A similar problem has already been reported by other users. Dziękujemy za zgłoszenie tego problemu. Podobny problem był już zgłaszany przez innych użytkowników.
Recommended Posts