T_cave Posted December 22 Posted December 22 At Dąbrowa Górnicza Strzemieszyce both the 429xx and 249xx trains are scheduled for Peron I Track 1, however for the 429xx trains this means they have to go over a slow 40 km/h switch on both sides of the station. However if the PH was scheduled for Peron II Track 2 they would have a Vmax entry and exit.
SIMRAIL Team Admin BOT Posted 20 hours ago SIMRAIL Team Posted 20 hours ago Thank you for reporting this issue. A similar problem has already been reported by other users. Dziękujemy za zgłoszenie tego problemu. Podobny problem był już zgłaszany przez innych użytkowników.
Recommended Posts