T_cave Posted Friday at 03:53 PM Posted Friday at 03:53 PM After loading Dąbrowa Górnicza Wschodnia signalbox today on INT1 I found the switch 7ab locked in the - (minus) position. Which means the switch is lined to a closed track (track 10), also because of this track 8 becomes unusable. Even after restarting the game, switch 7ab is in the - (minus) position every time, and unable to be moved.
SIMRAIL Team Admin BOT Posted Saturday at 08:02 AM SIMRAIL Team Posted Saturday at 08:02 AM Thank you for reporting this issue. A similar problem has already been reported by other users. Dziękujemy za zgłoszenie tego problemu. Podobny problem był już zgłaszany przez innych użytkowników.
Recommended Posts